Follow us
5.00
5.0 USD 5.00
5.00
Last Update 10/23/2025
Completion Time 30 minutes
Add-on Video
  • Introductions
  • Specific Support
    • I.A Cut — II.A Fuse Interfacings
    • II.B Prepare Sleeve Main
    • II.C Create Sleeve Front
    • II.D Attach Sleeve Lining
    • II.E Round/Trim Corners
    • II.F Turn Sleeve and Topstitch
    • II.G Attach Snap Closure